Elevator Acceptance Testing

Owner-side witnessing of elevator acceptance tests before you sign off on new or modernized equipment.

How our Elevator Acceptance Testing service works

Acceptance testing is the last chance to confirm that a new or modernized elevator performs as specified before the contractor is paid in full. We witness required code tests, verify performance criteria such as speed, leveling, and door timing, and compile a punch list of anything that falls short.

Common problems we solve

  • The contractor wants final payment, but the elevator still misbehaves.
  • You lack the expertise to judge whether tests were properly performed.
  • Specified performance criteria were never measured.

What you receive

  • Witnessing of safety and code acceptance tests
  • Performance measurements against the specification
  • Detailed punch list with photos
  • Verification of closeout documentation and wiring diagrams

The outcome

You accept equipment that meets the specification, with documentation in hand and leverage preserved until every item is resolved.

Local expertise from Fairfax, VA

We witness acceptance testing on new construction and modernization projects across Northern Virginia, Washington DC, and Maryland.

Elevator Acceptance Testing FAQ

What is elevator acceptance testing?

A series of code-required safety tests and performance checks performed before new or altered equipment is placed into service.

Why should an owner's consultant attend?

To independently confirm the tests are complete and the equipment meets the contract specification before final payment.

What documents should I receive at closeout?

Wiring diagrams, MCP documentation, test reports, warranties, and any required diagnostic tools.